Since the transition joint can be adapted to the needs of various industrial enterprises, it can be regarded as a relatively common joint. As an important part of the transition, it must not be sloppy during installation, otherwise it is easy to cause leakage. Some special industries Even safety accidents are prone to occur, so we should be clear about the steps of the transition joint body during installation. Let me introduce the installation steps of the transition joint body in detail below:
1. Check before installation
Before the transition joint body is installed, all parts should be checked to see if there is a shortage of parts, whether the parts are damaged, and whether there is a wrong connection when connecting.
2. Parts splicing
All the parts that can be assembled as a whole are assembled and spliced ​​to lay a good foundation for the final assembly. During the process, the connection should be as compact as possible to avoid leakage.
3. Bolt fixing
Fix all assembled parts as a whole with bolts and nuts to ensure the firmness of the fixation, and it should not be too tight, which will easily cause damage to the parts.
4. Adjust the position
Install the finally assembled transition joint and adjust the final position to ensure that it can work normally.
5. Test performance
Finally, the performance of the transition joint body should be tested. The work test detects whether there will be leakage and whether the installation is loose, so as to ensure that there will be no safety problems.
Through the above introduction, I believe that everyone has a final understanding of the installation steps of the transition joint body. As an important transition point of the machine, the meaning of the transition joint can be imagined. Therefore, it is necessary to focus on observation during installation. Steps can not be wrong one step, to avoid serious security problems.